You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Embung di Jalan Kemang Utara IX Terus Dikebut

Dharma Jaya Embung Construction Keeps Being Accelerated

We will also build a retention embung next March

The South Jakarta Water Resources Sub-agency (SDA) reported that the progress of the construction of the Dharma Jaya Embung (artificial lake) on Jalan Kemang Utara IX, Bangka Urban Village, Mampang Prapatan Sub-district has reached 50 percent.

South Jakarta SDA Sub-agency's Drainage Maintenance Section Staff, Shahnan stated, the reservoir was built to prevent flooding due to high water discharge in the Mampang River, especially during the rainy season.

E. Jakarta Acting Mayor Inspects Setu Biru Embung for Planting Trees

"This has been studied properly, so it will provide benefits to local residents," he expressed, Tuesday (2/25).

He explained the work was divided into two stages, the first of which was the construction of an embung as a conservation area of ​​1,600 square meters.

Then, his party also built an embung as a retention pond covering 600 square meters for flood control.

"For the conservation embung, we sent four excavators on November 20, 2024, and finally completed. We will also build a retention embung next March," he explained.

He added the Dharma Jaya Embung would also have supporting facilities, such as jogging tracks, parks, play areas, pump houses, and public toilets.

"Hopefully, everything goes smoothly so that the results obtained are more optimal," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1341 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1015 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye957 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye731 personAldi Geri Lumban Tobing
  5. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye697 personAldi Geri Lumban Tobing